Kings Beach SRA Preliminary GP Revision and EIR/Kings Beach Pier Rebuild Project EIR/EIS

6 Documents in Project

Summary

SCH Number
2015122056
Lead Agency
California Department of Parks and Recreation
Document Title
Kings Beach SRA Preliminary GP Revision and EIR/Kings Beach Pier Rebuild Project EIR/EIS
Document Type
NOD - Notice of Determination
Received
Posted
10/22/2018
Present Land Use
Town center/mixed use waterfront recreation subdistrict
Document Description
CSP is proposing a revision to the General Plan (GP; adopted in 1980). The GP includes conceptual plans for development of and improvements to all of the property managed as Kings Beach State Recreation Area (KBSRA) (13.9 acres). Future projects identified in the General Plan revision include a near-term public pier at KBSRA that is functional for multi-use recreational benefits at a wide range of water levels (i.e., 6217 foot lake bed elevation mavugational target)

Contact Information

Name
Steve Musillami
Agency Name
California Department of Parks and Recreation
Contact Types
Lead/Public Agency

Location

Counties
Placer
Cross Streets
North Lake Blvd. (SR 28) and Coon Street
Zip
96143
Total Acres
13.91
Parcel #
Various
State Highways
SR 28, SR 267
Schools
Kings Beach ES
Waterways
Lake Tahoe
Township
16N
Range
18E
Section
19
Base
Kings Be
Other Location Info
Kings Beach

Notice of Determination

Approving Agency
California State Park and Recreation Commission
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print