Laguna Creek Trail - Camden Spur Project - North (Lake or Streambed Alteration Agreement No. 1600-2016-0046-R2)
5 Documents in Project
Summary
SCH Number
2015122047
Lead Agency
City of Elk Grove
Document Title
Laguna Creek Trail - Camden Spur Project - North (Lake or Streambed Alteration Agreement No. 1600-2016-0046-R2)
Document Type
NOD - Notice of Determination
Received
Posted
7/12/2016
Present Land Use
Land Use - Park, open space, agricultural residential, and low-density residential. General Plan - Multi-use Trail
Document Description
CDFW has executed Lake and Streambed Alteration Agreement No. 1600-2016-0046- R2, pursuant to section 1602 of the Fish and Game Code to the project Applicant, City of Elk Grove.
The project is limited to extending a multi-use trail from the west end of the existing Laguna Creek Trail at the northern tip of Camden Park to MacDonald Park via Beckington Dr. Pre-construction work includes setting up water pollution control features to prevent silt laden materials or runoff from entering Laguna Creek. Water pollution control features will be based on Caltrans and/or CA Storm Water Quality Association standard best management practices (BMPs). Construction work includes clearing away existing vegetative growth along the trail route, clearing trees, earthmoving work- including excavation and fill placement, import of aggregate materials and hot mix asphalt pavement or concrete, placement of new storm drain pipe - including excavation and backfill ,construction fo a reinforced concrete headwall, placement of rock slope protection and pavement striping activities. Work includes trenching in new irrigation lines and heads and replacement of any damaged landscaping within existing landscaped areas of Camden Park. The project will result in 0.096 acre of permanent impacts and 0.284 acre of temporary impact to habitat under the jurisdiction of the Dept.
Contact Information
Name
Tanya Sheya
Agency Name
CDFW
Contact Types
Lead/Public Agency
Phone
Location
Cities
Elk Grove
Counties
Sacramento
Cross Streets
Beckington Drive and Camden Park and MacDonald Park
Zip
95624
Parcel #
Various
Notice of Determination
Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.