Laguna Creek Trail-Camden Spur Project-South (Lake or Streambed Alteration Agreement No. 1600-2016-0046-R2)

3 Documents in Project

Summary

SCH Number
2015122046
Lead Agency
Elk Grove, City of (City of Elk Grove)
Document Title
Laguna Creek Trail-Camden Spur Project-South (Lake or Streambed Alteration Agreement No. 1600-2016-0046-R2)
Document Type
NOD - Notice of Determination
Received

Document Description
CDFW has executed Lake and Streambed Alteration Agreement No. 1600-2016-0046-R2, pursuant to section 1602 of the Fish and Game Code to the project Applicant, City of Elk Grove. The project is limited to extending a multiuse trail from the west end of the existing Laguna Creek Trail at the northern tip of Camden Park to MacDonald Park via Beckington Dr. Pre-construction work includes setting up water pollution control features to prevent silt laden materials or runoff from entering Laguna Creek. Water includes clearing away existing vegetative growth along the trail route, clearing trees, earthmoving work- including excavation and fill placement, import of aggregate materials and hot mix asphalt pavement or concrete, placement of new storm drain pipe - including excavation and backfill, construction of a reinforced concrete headwall, placement of rockslope protection and pavement striping activities. Work includes trenching in new irrigation lines and heads and replacement of any damaged landscaping within existing landscaped areas of Camden Park. The project will result in 0.096 acre of permanent impacts and 0.284 acre of temporary impact to habitat under the jurisdiction of the Dept.

Contact Information
Tanya Sheya
CDFW
1701 Nimbus Road, Suite A
Rancho Cordova, CA 95670

916-358-2953

Location

Cities
Elk Grove
Counties
Sacramento
Cross Streets
Camden Park and Bond Road
Zip
95624
Parcel #
Various

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Lead Agency
Approved On
Final EIR Available Location
1701 Nimbus Road, Suite A, Rancho Cordova, CA 95670

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A Statement of Overriding Considerations was adopted for this project
No
(5) Findings were made pursuant to the provisions of CEQA
No
Download CSV New Search