Laguna Creek Trail - South Camden Spur Project (PT0121)

3 Documents in Project

Summary

SCH Number
2015122046
Lead Agency
City of Elk Grove
Document Title
Laguna Creek Trail - South Camden Spur Project (PT0121)
Document Type
NOD - Notice of Determination
Received
Posted
2/5/2016
Present Land Use
Land Use- Park, open space, agricultural residential, public, and commercial. General Plan - Multi-use Trail
Document Description
The City of Elk Grove proposes to construct an approx. 0.5 mile paved asphalt multi-use trail from the north end of Camden Park south to Bond Road with a combined bridge/weir crossing at Camden Lake, as an extension to the Laguna Creek Trail. The northern end of the proposed project would connect to the western end of the Laguna Creek Trail. The proposed Project includes at least two slightly wider areas for park benches, trash receptacles, dog waste bag containers, and biologic educational signs. The majority of the proposed Project will be constructed within the 100-year floodplain. The proposed Project is consistent with the Elk Grove General Plan and the Elk Grove Bicycle, Pedestrian, and Trails Master Plan. Each of these plans identifies the need for an off-street multi-use trail system providing connections throughout the City and the Sacramento region. The Project would close a gap in the overall Laguna Creek Trail system, provide improved access between residential and commercial areas and schools, and present recreational opportunities and an alternative method of transportation for City residents.

Contact Information

Name
Jessica Jordan
Agency Name
City of Elk Grove
Contact Types
Lead/Public Agency

Location

Cities
Elk Grove
Counties
Sacramento
Cross Streets
Camden Park and Bond Road
Zip
95624
Parcel #
Various

Notice of Determination

Approving Agency
City of Elk Grove
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print