Palo Alto Regional Water Quality Control Plan Sludge Dewatering and Loadout Facility Project
3 Documents in Project
Summary
SCH Number
2015122033
Lead Agency
City of Palo Alto
Document Title
Palo Alto Regional Water Quality Control Plan Sludge Dewatering and Loadout Facility Project
Document Type
NOD - Notice of Determination
Received
Posted
4/21/2016
Present Land Use
Public Facilities, PF (D); Major Institution/Special Facilities
Document Description
The proposed project would include the construction and operation of a sludge dewatering and truck loadout facility at the Palo Alto Regional Water Quality Control Plant (RWQCP). The proposed project includes the construction of a new building to accommodate the installation of four belt filter presses, along with mechanisms to transfer the cake to three storage bins and eventually loading into trucks. These activities would occur within the new dewatering and truck loadout facility building. The new building would be a two story, cast-in place concrete structure that would contain space for the belt filter presses, truck loadout, and other miscellaneous support areas. EA: A draft Initial Study and Negative Declaration have been prepared and the public comment period was Dec. 15, 2015 to Jan 13, 2016. Zone District: PF (D).
Contact Information
Name
Amy French
Agency Name
City of Palo Alto
Contact Types
Lead/Public Agency
Phone
Location
Coordinates
Cities
Palo Alto
Counties
Santa Clara
Cross Streets
Embarcadero Road and Embarcadero Way
Zip
94303
Total Acres
0.48
Parcel #
008-03-029
Airports
Palo Alto Airport
Waterways
Palo Alto Baylands, SF Bay
Notice of Determination
Approving Agency
City of Palo Alto
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.