Garden Bar Road at Sanford Bridge Widening Project (Streambed Alteration Agreement No. 1600-2016-0169-R2)

4 Documents in Project

Summary

SCH Number
2015122027
Lead Agency
Nevada County
Document Title
Garden Bar Road at Sanford Bridge Widening Project (Streambed Alteration Agreement No. 1600-2016-0169-R2)
Document Type
NOD - Notice of Determination
Received
Posted
12/30/2016
Present Land Use
Rural-40 Residential
Document Description
CDFW has executed Lake and Streambed Alteration Agreement No. 1600-2016-0169-R2, pursuant to section 1602 of the Fish and Game Code to the project Applicant, Nevada County Department of Public Works. The project will replace the existing structure with a single span, 49' x 15' cast-in-place concrete slab bridge. The bridge will accommodate one 11 foot wide lane, and (2) two foot shoulders. Bridge railing will be mounted on the edge of the deck. The bridge will continue to be supported by two spread footing abutments. Construction will include approx. 120 feet of roadway south of the bridge, and 130 feet of roadway norht of the bridge. The roadway will remain in one travel lane (approx. 15.5 feet wide). A pull-out will be provided on the northwest side of the bridge. Additionally, 590 sq. ft. of rock slope protection will be palced along the abutments.

Contact Information

Name
Amy Kennedy
Agency Name
CDFW
Contact Types
Lead/Public Agency

Location

Counties
Nevada
Cross Streets
Garden Bar Road and Sanford Road
Zip
4
Total Acres
95949
Parcel #
54-101-42
Waterways
Little Wolf Creek and Bear River
Township
14N
Range
7E
Section
23
Base
MD
Other Location Info
Wolf

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print