Calistoga Senior Apartments Outfall Reconstruction/Riparian Enhancement

3 Documents in Project

Summary

SCH Number
2015122023
Lead Agency
City of Calistoga
Document Title
Calistoga Senior Apartments Outfall Reconstruction/Riparian Enhancement
Document Type
NOD - Notice of Determination
Received
Posted
2/23/2017
Present Land Use
Vacant / R-3 Multi-Family Residential/Office/High Density Residential
Document Description
Project is limited to: 1) Excavating and removing an approx. 20-foot long section of an existing failed 21-inch diameter reinforced concrete pipe and outfall structure. 2) Installing a new approx. 20-foot long section of 24-inch reinforced concrete pipe with a 24-inch by 48 inch flared end. 3) Rock Slope Protection (RSP) will be placed immediately below the outfall, covering approx. 90 sq. ft. to a minimum depth of 24-inches. 4) Riparian restoration and enhancement will occur along an approx. 140 linear foot area. The project is located on the north bank of Napa River, approx. 1,000 feet south of 611 Washington Street, east of Eddy Street and west of Earl Street, in the City of Calistoga, County of Napa, State of CA.

Contact Information

Name
Suzanne Gilmore
Agency Name
CDFW
Contact Types
Lead/Public Agency

Location

Cities
Calistoga
Counties
Napa
Cross Streets
611 Washington STreet between Eddy & Earl Streets
Zip
94515
Total Acres
1.02
Parcel #
011-260-027
State Highways
29
Schools
Calistoga Elem, MS. HS
Waterways
Napa River

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
N/A
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
N/A