Porterfield Creek Open Space Trails (Lake or Streambed Alteration Agreement No. 1600-2017-0417-R3)

2 Documents in Project

Summary

SCH Number
2015122019
Lead Agency
Cloverdale, City of (City of Cloverdale)
Document Title
Porterfield Creek Open Space Trails (Lake or Streambed Alteration Agreement No. 1600-2017-0417-R3)
Document Type
NOD - Notice of Determination
Received

Document Description
CDFW has executed Lake and Streambed Alteration Agreement No. 1600-2017-0417-R3, pursuant to section 1602 of the Fish and Game Code to the project applicant, City of Cloverday. The current project is limited to installing a new footbridge across South Branch Porterfield Creek. The proposed bridge will be a single span and fiberglass with dimensions of 5 feet by 50 feet. Bridge pieces will be transported up existing trails via ATV, then walked to the crossing location and assembled on site. Bridge footings will be 6 feet wide by 1 foot thick by 2 feet deep. The footings will be placed approx. 18 feet from top of bank on the left bank and approx. 15 feet away from top of the right bank looking downstream. The footings will be made from concrete that will be poured in place. The bridge will allow for a wet creek crossing to be decommissioned. All work will be conducted outside of the stream channel.

Contact Information
Karen Weiss
CDFW
7329 Silverado Trail
Napa, CA 94558

707-944-5525

Location

Cities
Cloverdale
Counties
Sonoma
Cross Streets
West of the terminus of Skyview Drive
Zip
95425
Parcel #
Various
State Highways
US 101
Airports
Cloverdale Municipal
Waterways
Porterfield Creek

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On
Final EIR Available Location
7329 Silverado Trail, Napa, CA 94558

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A Statement of Overriding Considerations was adopted for this project
No
(5) Findings were made pursuant to the provisions of CEQA