3225 El Camino Real Mixed Use Project

2 Documents in Project

Summary

SCH Number
2015122014
Lead Agency
City of Palo Alto
Document Title
3225 El Camino Real Mixed Use Project
Document Type
NOD - Notice of Determination
Received
Posted
5/3/2016
Present Land Use
Retail (Footlocker) / Service Commercial (CS) District/ Service Commercial (CS)
Document Description
The proposed project would involve the demolition of an existing 7,000 sq. ft. commercial building and the construction and operation of two new buildings: a four-story mixed-use building with ground floor retail and three stories of residential condominiums (eight units total), and a two-story building with ground floor retail/office and second-floor office space. The project would include a surface parking area (6,127 sf) and one level of subterranean parking (24,884 sf). Total grass floor area of both buildings would be 29,249 sf, including 9,036 sf of retail, 2,949 sf of office space, and 17,265 sf of residential space. The buildings would be connected by a plaza and pedestrian walkway.

Contact Information

Name
Clare Campbell
Agency Name
City of Palo Alto
Contact Types
Lead/Public Agency

Location

Cities
Palo Alto
Counties
Santa Clara
Cross Streets
El Camino Real and Portage Ave.
Zip
94306
Parcel #
132-38-042
State Highways
US 101, SR-82
Railways
UP, Caltrain
Airports
San Jose Airport
Schools
Jordon MS
Waterways
Mateadero Creek, San Francisco Bay

Notice of Determination

Approving Agency
City of Palo Alto
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print