RSL Operating, Inc., Wood Grinding Facility

3 Documents in Project

Summary

SCH Number
2015122011
Lead Agency
Port of Stockton
Document Title
RSL Operating, Inc., Wood Grinding Facility
Document Type
NOD - Notice of Determination
Received
Posted
2/2/2016
Present Land Use
Port District (PT)/Industrial Use
Document Description
The proposed project involves construction and operation of a wood grinding facility at the Port of Stockton. The facility would receive (via truck and rail) and separately process wooden railroad ties, urban green wood waste/pre-ground wood material. Both products would be sold as fuel to existing permitted facilities. A new rail spur that would connect to an existing California Traction Company rail line would be constructed. Construction activities would consist of grading and site improvements, including construction of the rail spur and specific areas designated for materials delivery and staging, materials processing, and materials transfer and load out. Construction of the proposed project is expected to begin in early 2016 and to take up to 5 weeks.

Contact Information

Name
Jason Cashman
Agency Name
Port of Stockton
Contact Types
Lead/Public Agency

Location

Cities
Stockton
Counties
San Joaquin
Cross Streets
West Washington Street and Port Road 22
Zip
95203
Total Acres
8
Parcel #
145031\012 (small piece of this parcel)
State Highways
SR-4
Railways
CCT, BNSF, UP
Waterways
San Joaquin River
Township
1N
Range
6E
Section
9
Base
1851

Notice of Determination

Approving Agency
Stockton Port District
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print