Cedar Flats Estates, Rezone and Vesting Tentative Subdivision Map Project

2 Documents in Project

Summary

SCH Number
2015122004
Lead Agency
Galt, City of (City of Galt)
Document Title
Cedar Flats Estates, Rezone and Vesting Tentative Subdivision Map Project
Document Type
NOD - Notice of Determination
Received
Posted
2/19/2016
Present Land Use
Maximum Density Single-Family (R1C) and Designated Low Density Residential

Document Description
The applicant proposing to subdivide 30 acres into 120 lots with a requested rezone from R1C to Cedar Flats Estates Planned Development (PD), with lot sizes ranging from 6,514 sf to 9,410 sf. The development standard for min street front in the R1C zone is 65 ft. A PD is requested to accommodate a min 51 ft street front. The proposed density is 4 dwelling units per acre. The entirety of Cedar Flats Estates will have the PD zoning designation but only Area A, the eastern most portion of the site, is proposed as a private gated community with private streets. Areas B, C and D will have public streets and will not be gated. The project includes the construction of a motor vehicle, bicycle and pedestrian bridge on Cedar Flat Ave connecting Cedar Flats Estates with River Oaks 1. The project also includes dedicating 3.6 acres of open space and a Class 1 Bicycle Lane along Dead Man's Gulch.

Contact Information
Chris Erias
City of Galt
495 Industrial Drive
Galt, CA 95632

Phone : (209) 366-7200

Location

Coordinates
36°16'11.75"N 121°17'43.34"W
Cities
Galt
Counties
Sacramento
Cross Streets
South of Twin Cities Road and east of SR 99
Zip
95632
Total Acres
30
Parcel #
150-0030-013,-14,-15,-16,-17
State Highways
SR-99, 104
Railways
UPRR
Schools
Various
Waterways
Deadman Gulch
Township
19S
Range
6E
Section
14
Base
MDBM

Notice of Determination

Approving Agency
City of Galt
Approving Agency Role
Lead Agency
Approved On
Final Environmental Document Available at
380 Civic Dr, Galt, CA 95632

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Download CSV New Search