Lanzit Ditch Bridge Replacement (Lake or Streambed Alteration Agreement No. [EPIMS-SBR-43041- R6])

3 Documents in Project

Summary

SCH Number
2015121048
Lead Agency
San Bernardino County
Document Title
Lanzit Ditch Bridge Replacement (Lake or Streambed Alteration Agreement No. [EPIMS-SBR-43041- R6])
Document Type
NOD - Notice of Determination
Received
Posted
3/21/2024
Document Description
The California Department of Fish and Wildlife (CDFW) has executed Lake and Streambed Alteration Agreement (EPIMS-SBR-43041-R6), pursuant to Fish and Game Code section 1602, to the project Applicant, San Bernardino County Department of Public Works. The Project is limited to the replacement of the existing timber bridge at Lanzit ditch with a new, reinforced concrete bridge. Construction activities include: relocation of existing utility lines, including fiber optic telecommunication line and solar powered local utility lines which are currently tied to the bridge or adjacent to the bridge; removing existing guardrails, bridge deck, and transition structures; removal of existing piles and necessary grading; and construction of a new bridge.

Contact Information

Name
Marlee Poff
Agency Name
Fish and Wildlife, Region 6
Job Title
Environmental Scientist
Contact Types
Responsible Agency

Location

Counties
San Bernardino
Regions
Southern California

Notice of Determination

Approving Agency
Fish and Wildlife, Region 6
Approving Agency Role
Responsible Agency
Approved On
County Clerk
San Bernardino
Final Environmental Document Available at
San Bernardino County – Public Works 825 E. Third Street San Bernardino CA 92415

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print