Rose Creek Bikeway

5 Documents in Project

Summary

SCH Number
2015121045
Lead Agency
San Diego Association of Governments
Document Title
Rose Creek Bikeway
Document Type
NOD - Notice of Determination
Received
Posted
6/1/2016
Present Land Use
Public Right-of-Way, 424-571-02 City of San Diego, 417-180-15 USA
Document Description
The proposed project includes 1.3 miles of protected bike lanes within the City of San Diego right-of-way on the west side of Santa Fe Street and 0.8 miles (off-street) of bike lanes along the eastern bank of Rose Creek. The protected bike lanes would connect with he existing Rose Canyon Bicycle Path and continue the west side of Santa Fe Street. The off-street bike lanes would start just south of the Santa Fe Street bridge over Rose Creek on a pre-fabricated, steel bridge, which would be parallel to the existing bridge. The bike path would continue along the eastern bank of Rose Creek on an earthen bench behind existing businesses fronting Santa Fe and Damon Streets. The bike path would then cover under the I-5 freeway bridge over Rose Creek and connect with existing Rose Creek Bike Path.

Contact Information

Name
Lauren Esposito
Agency Name
San Diego Association of Governments
Contact Types
Lead/Public Agency

Location

Cities
San Diego
Counties
San Diego
Cross Streets
Santa Fe Street/Damon Ave.
Zip
92109
Total Acres
13
Parcel #
424-571-02/417-180-15
State Highways
SR 52
Railways
BNSF
Schools
Alcott Elem.
Waterways
Rose Creek
Other Location Info
Clairemont Pacific Beach

Notice of Determination

Approving Agency
San Diego Association of Governments
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
N/A
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.