City Fibers Plant No. 2 Large Volume Solid Waste Transfer Station and Material Recovery Facility

3 Documents in Project

Summary

SCH Number
2015121040
Lead Agency
City of Los Angeles
Document Title
City Fibers Plant No. 2 Large Volume Solid Waste Transfer Station and Material Recovery Facility
Document Type
NOD - Notice of Determination
Received
Posted
2/10/2016
Present Land Use
M-3 Heavy Industrial Zone
Document Description
The proposed project is a revision to an existing Large Volume Solid Waste Facility Permit (SWFP) (reference permit No. 19-AR-1326) for the City Fibers Plant No. 2, located at 2545 E. 25th Street in the City of Los Angeles. The SWFP was originally issued by the City of Los Angeles Dept. of Building and Safety Local Enforcement Agency (LEA) in partnerships with the CA Dept. of Resources, Recycling, and Recovery on September 22, 2010, for a 500 ton per day (TPD) Material Recovery Facility (MRF) and transfer station. The requested SWFP revision will increase the permitted amount of material processed daily at the facility from 500 TPD to a maximum of 1,080 TPD and expand the total site area from 1.26 acres to 1.61 acres. No new construction or new structure are proposed under the project.

Contact Information

Name
Jose Gutierrez
Agency Name
City of Los Angeles
Contact Types
Lead/Public Agency

Location

Cities
Los Angeles, Los Angeles, City of
Counties
Los Angeles
Cross Streets
Minerva Streetand Harriett Street
Zip
90058
Total Acres
1.61
Parcel #
5168-021-004, 005, and 010
State Highways
10/5 Fwy
Railways
1
Schools
10
Waterways
LA River
Township
2S
Range
13W
Section
10
Base
San Bern

Notice of Determination

Approving Agency
City of LA, LEA
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print