Cleveland National Forest Unauthorized Route Decommissioning

3 Documents in Project

Summary

SCH Number
2015121023
Lead Agency
U.S. Forest Service
Document Title
Cleveland National Forest Unauthorized Route Decommissioning
Document Type
NOD - Notice of Determination
Received
Posted
9/7/2016
Present Land Use
Cleveland National Forest and adjacent lands.

Document Description
The OHMVR Division proposes to award grant funds to the Cleveland National Forest for the decommissioning of approx. 64 miles of unauthorized routes in the Descanso Ranger District and the Trabuco Ranger District. Restoration would be accomplished through a variety of options, including: extreme surface roughening, using an excavator to break up compacted soils, increase infiltration, and disperse runoff; recontouring slopes; spreading groundcover, such as rock, organic matter, or mulch; spreading native seed; and installing pipe-rail barriers to prevent re-entry. Signage would be installed at each site to direct riders to authorized areas for vehicle use.

Contact Information
Maria Olmos
CA Dept. of Parks and Recreation
1725 23rd St., Suite 200
Sacramento, CA 95816

Phone : (916) 445-1667

Location

Counties
Orange Riverside San Diego
Other Location Info
Various

Notice of Determination

Approving Agency
CA Dept. of Parks and Recreation, OHMVR Division
Approving Agency Role
Lead Agency
Approved On
Final Environmental Document Available at
1725 23rd St., Suite 200, Sacramento, CA 95816

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No
Download CSV New Search