Segment C of the Park to Playa Trail
3 Documents in Project
Summary
SCH Number
2015121007
Lead Agency
Baldwin Hills Regional Conservation Authority
(BHRCA)
Document Title
Segment C of the Park to Playa Trail
Document Type
NOD - Notice of Determination
Received
Posted
11/21/2016
Present Land Use
Vacant, detention basin, drainage channel/Low Density Multi-Family and Open Space/Residential Single-Family and Open
Document Description
The BHRCA has redefined the alignment for Segment C of the Park to Playa Trail, which is a comprehensive trail system at the parks and open space areas in the Baldwin Hills. Segment C is the section of the proposed trail through Blair Hills that would connect the Baldwin Hills Scenic Overlook with the Kenneth Hahn State Recreation Area. Phase 1 includes construction and use of the western portion of Segment C (west of the Stoneview Nature Center) and Phase 2 includes construction and use of the eastern portion of Segment C and a pedestrian bridge over La Cienega Blvd (east of the Stoneview Nature Center).
Contact Information
Name
Ana Straabe
Agency Name
Baldwin Hills Regional Conservation Authority
Contact Types
Lead/Public Agency
Phone
Location
Coordinates
Cities
Culver City, Culver City, Los Angeles, City of, Los Angeles
Counties
Los Angeles
Cross Streets
La Cienega Blvd and Wrightcrest Drive
Zip
90008
State Highways
I-10, SR-187
Railways
Metro Light Rail
Waterways
Ballona Creek
Township
2S
Range
14W
Section
17
Base
SBM
Notice of Determination
Approving Agency
Baldwin Hills Regional Conservation Authority
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.