Verizon Big Horn Facility - Conditional Use Permit & Minor Deviation (EG-15-022)
Summary
- SCH Number
- 2015118297
- Public Agency
- City of Elk Grove
- Document Title
- Verizon Big Horn Facility - Conditional Use Permit & Minor Deviation (EG-15-022)
- Document Type
- NOE - Notice of Exemption
- Received
- Posted
- 11/30/2015
- Document Description
- Conditional Use Permit to construct and operate a wireless telecommunications facility on a 1.62-acre parcel along Big Horn Boulevard. The proposed tower consists of a 58-foot tall stealth broadleaf mono-tree with eight (8) antennas mounted at a centerline of 52-feet, 30-kw standby diesel generator, and associated ground equipment enclosed within a 1,464-square foot lease area surrounded by a 7-foot tall wrought iron fence.
- Contact Information
-
Nate Anderson
City of Elk Grove
Lead/Public Agency
8401 Laguna Palms Way
Elk Grove, CA 95758
Phone : (916) 478-2245
Location
- Cities
- Elk Grove
- Counties
- Sacramento
Notice of Exemption
- Exempt Status
- Categorical Exemption
- Type, Section or Code
- 15303, Class 3
- Reasons for Exemption
- Construction and location of limited numbers of new, small facilities or structures; installation of small new equipment and facilities in small strucutres; and the conversion of small structures from one use to another where only minor modifications are made in the exterior of the structure.
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.