Fiddletown Road Bridge Replacement Project

4 Documents in Project

Summary

SCH Number
2015112056
Lead Agency
Amador County
Document Title
Fiddletown Road Bridge Replacement Project
Document Type
NOD - Notice of Determination
Received
Posted
2/23/2016
Present Land Use
AG - Exclusive Agricultural District

Document Description
Amador County (County) proposed to replace the existing two lane Fiddletown Road Bridge (Bridge no. 26C-0021) (proposed project) with a new two-lane bridge. The new bridge would most likely be a concrete precast cored slab bridge with a span of approx. 40 feet long and a width of 30 feet. The widened roadway at the bridge will be necked down to conform to the existing roadway at approx. 200 feet from each side of the bridge. The new bridge will accommodate two 11 foot wide travel lanes and two 4 foot wide shoulders. Possible aesthetic features will be added tot he proposed bridge, including architectural formliners and/or a concrete facade along the edge of the deck to mimic the appearance of an arch bridge.

Contact Information
Aaron Brusatori
Amador County
810 Court Street
Jackson, CA 95642

Phone : (209) 223-6429

Location

Counties
Amador
Cross Streets
approx. 0.2 miles east of American Flat Road
State Highways
49
Waterways
North Fork of Dry Creek
Other Location Info
Fiddletown

Notice of Determination

Approving Agency
Amador County
Approving Agency Role
Lead Agency
Approved On
Final Environmental Document Available at
810 Court St, Jackson, CA 95642

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No
Download CSV New Search