Ciminelli Estate Vineyard Conversion Project
5 Documents in Project
Download CSV
New Search
Print
Summary
- SCH Number
- 2015112052
- Lead Agency
- Forestry and Fire Protection, Department of (California Department of Forestry and Fire Protection)
- Document Title
- Ciminelli Estate Vineyard Conversion Project
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 6/19/2017
- Present Land Use
- Ag Watershed
- Document Description
- Conversion of 17.8 gross acres of land to 14.4 net acres of commercial vineyard (Project Site. A Timber Conversion Permit (TCP) and Napa County Erosion Control Plan (ECP) are required for the proposed project. A Timber Harvest Plan (THP) is being prepared concurrently for the harvest of the same 17.8 acres. Vineyard blocks will include wine grapes, internal farm avenues, and space for vineyard maintenance operations. Groundwater will be used for irrigation. Post-project sediment erosion conditions and peak hydrological runoff are projected to be below pre-project conditions. No sensitive habitats, sensitive plant species, or cultural resources occur within the Project Site.
- Contact Information
-
Bill Solinsky
Cal Fire
P.O. Box 944246
Sacramento, CA 94244-2460
Phone : (916) 531-2173
Location
- Coordinates
- 38°35'57.9"N 122°27'12.1"W
- Counties
- Napa
- Cross Streets
- Summit Lake Drive
- Zip
- 94508
- Total Acres
- 40
- Parcel #
- 018-230-002
- State Highways
- N/A
- Railways
- N/A
- Airports
- Angwin-Parrett Airfield
- Schools
- Howell Mtn Elementary
- Waterways
- N/A
- Township
- 9N
- Range
- 5W
- Section
- 30
- Base
- MDBM
- Other Location Info
- Angwin
Notice of Determination
- Approving Agency
- Calfire
- Approving Agency Role
- Lead Agency
- Approved On
- Final Environmental Document Available at
- 1416 9th St., Sacramento, CA 95814
Determinations
- (1) The project will have a significant impact on the environment
- No
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- No
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- Yes
- (4) A mitigation reporting or monitoring plan was adopted for this project
- N/A
- (5) A Statement of Overriding Considerations was adopted for this project
- No
- (6) Findings were made pursuant to the provisions of CEQA
- Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.