Sanitary Sewer Rehabilitation Project - Phase 5 (Project); Clean Water State Revolving Fund (CWSRF) No. C-06-8166-110
3 Documents in Project
Summary
SCH Number
2015112038
Lead Agency
City of Piedmont
Document Title
Sanitary Sewer Rehabilitation Project - Phase 5 (Project); Clean Water State Revolving Fund (CWSRF) No. C-06-8166-110
Document Type
NOD - Notice of Determination
Received
Posted
11/16/2016
Present Land Use
Mostly Suburban Residential and Open Space. Zoning is generally Single Family Residential with small areas of Public Facilities
Document Description
The project areas are residential and pipeline alignments are within the City's right of way or sewer easements associated residential lots. Total 32,748 feet will be rehabilitated out of which 23,275 feet will be within the City's streets and 7,497 feet will be within residential easements. Sub-basins W2 and @3 have been selected for rehabilitation in Phase 5, along with a series of sewer mains elsewhere in the sewer system. In addition, several lines in Sub-basin G1 will be replaced due to defects in cured-in-place pipe liners installed in 1995. Sewer main pipe sizes range from 6 to 10 inch but 90% of the sewer mains are 6 inch and eight inch lines. Construction is anticipated to be completed within 8-10 months, if all the priority sewer repairs are completed in Phase 5.
Contact Information
Name
Sahil Pathak
Agency Name
SWRCB
Contact Types
Lead/Public Agency
Phone
Location
Cities
Piedmont
Counties
Alameda
Cross Streets
Numerous within city
Zip
94611
State Highways
13,24,580
Schools
Various
Waterways
Lake Merritt
Notice of Determination
Approving Agency
State Water Board
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
N/A
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.