Tower Bridge Fender Replacement Project (Project) (Lake or Streambed Alteration Agreement No. 1600-2017-0259-R3)

9 Documents in Project

Summary

SCH Number
2015112002
Lead Agency
California Department of Transportation, District 3
Document Title
Tower Bridge Fender Replacement Project (Project) (Lake or Streambed Alteration Agreement No. 1600-2017-0259-R3)
Document Type
NOD - Notice of Determination
Received
Posted
2/12/2018
Document Description
CDFW has executed Lake and Streambed Alteration Agreement No. 1600-2017-0259-R3, pursuant to section 1602 of the Fish and Game Code to Caltrans as represented by Doug Lange. The project is limited to the removal of an existing fender system on the Tower Bridge that surrounds the in-water piers 6 and 7 of the bridge within the Sacramento River. The timber system will be replaced with modern plastic wales and sheathing supported by steel piles. All removal and construction activity will be performed via barge. The existing timber fender system will be removed via barge by mechanically cutting or breaking the existing pile off at or near the mudline. A total of 200 16-inch timber piles will be removed employing this method, 100 piles per. All piles will be placed in a containment basin along with any attached sediment or debris after removal and disposed of at an off-site facility. The new fender system will be installed via barge. A total of 104 new piles will be installed at pier 6 and 7 via barge mounted cranes with vibratory hammers. Eight 36-inch diameter steel pile sand ninety-six 24-inch diameter steel piles will replace the existing 200 creosote 16-inch timber piles. The eight new 36-inch steel piers and the ninety-six 24-inch steel piers will create a permanent loss of aquatic habitat of approx. 5,105 sq. ft. over 0.12 acres. The previously existing fender structure had an area of 4,266 sq. ft. over .10 acres. The completion of the new fender structure shall result in the net permanent impact of 839 sq. ft. over 0.02 acres.

Contact Information

Name
Robert Stanley
Agency Name
CDFW
Contact Types
Lead/Public Agency

Location

Cities
Sacramento, West Sacramento
Counties
Sacramento, Yolo
Cross Streets
SR 275
Zip
95814
State Highways
Hwy 275
Waterways
Sacramento River

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.