Geotechnical Investigations for the Tower Bridge Fender System Replacement Project (Streambed Alteration Agreement No. 1600-2016-0243-R3)

8 Documents in Project

Summary

SCH Number
2015112002
Lead Agency
Caltrans 3 (Marysville) (California Department of Transportation, District 3)
Document Title
Geotechnical Investigations for the Tower Bridge Fender System Replacement Project (Streambed Alteration Agreement No. 1600-2016-0243-R3)
Document Type
NOD - Notice of Determination
Received

Document Description
CDFW has executed Streambed Alteration Agreement No. 1600-2016-0243-R3, pursuant to section 1602 of the Fish and Game Code to the project Applicant, Caltrans, District 3. Project is limited to the collection of instream borings using a barge mounted drill in order to provide subsurface geological information for the larger Tower Bridge Fender Replacement Project. A barge and tow boat will be launched from Natomas Park boat ramp and drilling operations will occur at 4 designated locations in the wetted Sacramento River channel, alongside the Tower Bridge. The geotechnical investigation will temporarily impact 19.63 sq. in. (0.14 sq. ft.) of the riverbed. This Agreement covers the geotechnical investigations only and shall not be used for the construction of the larger project.

Contact Information
Alison Furler
CDFW
7329 Silverado Trail
Napa, CA 94559

209-234-3439

Location

Coordinates
38°34'49.9"N 121°30'29.8"W
Cities
West Sacramento Sacramento
Counties
Yolo Sacramento
Cross Streets
SR 275
Zip
95814
State Highways
Hwy 275
Waterways
Sacramento River

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On
Final EIR Available Location
7329 Silverado Trail, Napa, CA 94559

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A Statement of Overriding Considerations was adopted for this project
No
(5) Findings were made pursuant to the provisions of CEQA
No
Download CSV New Search