Lyon State Subdivision

3 Documents in Project

Summary

SCH Number
2015111063
Lead Agency
Orange County
Document Title
Lyon State Subdivision
Document Type
NOD - Notice of Determination
Received

Document Description
The project includes the development of 25 single family lots, each a minimum of 2 acres in area, served by a new private access street connecting to Coto de Caza Drive, on the southern 64 acres of the Lyon Estate property. The General Plan land use designation for the property is 1B Suburban Residential with allows for 0.5 to 18 dwelling units per acre. The Coto de Caza Specific Plan designation is Rural Residential which allows for 152 dwelling drainage through the center and oak trees and coastal sage scrub along the southerly boundary. A ridgeline extends along the western boundary of the entire parcel. A Vesting Tentative Tract Map (VTTM 17950) will subdivide the 64 acre property into 25 lots for residential development, 2 lots for the proposed private streets and 1 lot for the proposed stormwater treatment basin. The project required the transfer of 10 dwelling unit allocations between Planning Areas 2 and 7 within the Specific Plan. A Site Plan is attached hereto.

Contact Information
Kevin Canning
Orange County
12 Civic Center Plaza
Santa Ana, CA 92701-0238

714-667-8847

Location

Coordinates
33°36'46.5"N 117°35'27.0"W
Cities
Rancho Santa Margarita
Counties
Orange
Cross Streets
Coto de Caza Drive between Oso Parkway and Antonio Parkway
Zip
92679
Total Acres
64
Parcel #
788-011-01
State Highways
SR-241
Schools
Wagon Wheel ES
Waterways
Gobemadora Creek
Township
6S
Range
7W
Section
34-35
Base
SB

Notice of Determination

Approving Agency
County of Orange
Approved On
Final EIR Available Location
300 N. Flower Street, Santa Ana, CA 92703

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A Statement of Overriding Considerations was adopted for this project
Yes
(5) Findings were made pursuant to the provisions of CEQA
Yes
Download CSV New Search