California State Polytechnic University, Pomona; Approve the Campus Master Plan Revision for Student Housing Replacement Project

3 Documents in Project

Summary

SCH Number
2015111042
Lead Agency
California State University, Pomona (CPP)
Document Title
California State Polytechnic University, Pomona; Approve the Campus Master Plan Revision for Student Housing Replacement Project
Document Type
NOD - Notice of Determination
Received
Posted
11/21/2016
Present Land Use
Horse pasture /campus master plan - horse pasture
Document Description
The proposed campus master plan revision will provide for student housing facilities to replace 1,400 student beds in existing student residence halls as well as provide 245 additional beds on campus. The student housing facilities are anticipated to be six to eight stories in height, with a single-story dining commons. In addition, the project includes shifting of a segment of Kellogg Drive to the east, placing it along the eastern boundary of the site.

Contact Information

Name
Walter Marquez
Agency Name
Trustees of the CA State University
Contact Types
Lead/Public Agency

Location

Cities
Pomona
Counties
Los Angeles
Cross Streets
Within Cal Poly Pomona campus interior - Kellogg Drive on the East
Zip
91768
Total Acres
13
State Highways
I-10, SR 57
Railways
UP/BNSF
Schools
Various

Notice of Determination

Approving Agency
Trustees
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print