California State Polytechnic University, Pomona; Approve the Campus Master Plan Revision for Student Housing Replacement Project
3 Documents in Project
Download CSV
New Search
Print
Summary
- SCH Number
- 2015111042
- Lead Agency
- California State University, Pomona (CPP)
- Document Title
- California State Polytechnic University, Pomona; Approve the Campus Master Plan Revision for Student Housing Replacement Project
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 11/21/2016
- Present Land Use
- Horse pasture /campus master plan - horse pasture
- Document Description
- The proposed campus master plan revision will provide for student housing facilities to replace 1,400 student beds in existing student residence halls as well as provide 245 additional beds on campus. The student housing facilities are anticipated to be six to eight stories in height, with a single-story dining commons. In addition, the project includes shifting of a segment of Kellogg Drive to the east, placing it along the eastern boundary of the site.
- Contact Information
-
Walter Marquez
Trustees of the CA State University
Lead/Public Agency
401 Golden Shore
Long Beach, CA 90802-4210
Phone : (909) 869-4947
Location
- Cities
- Pomona
- Counties
- Los Angeles
- Cross Streets
- Within Cal Poly Pomona campus interior - Kellogg Drive on the East
- Zip
- 91768
- Total Acres
- 13
- State Highways
- I-10, SR 57
- Railways
- UP/BNSF
- Schools
- Various
Notice of Determination
- Approving Agency
- Trustees
- Approving Agency Role
- Lead Agency
- Approved On
- Final Environmental Document Available at
- 401 Golden Shore, Long Beach, CA 90802-4210
Determinations
- (1) The project will have a significant impact on the environment
- Yes
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- No
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- Yes
- (4) A mitigation reporting or monitoring plan was adopted for this project
- N/A
- (5) A Statement of Overriding Considerations was adopted for this project
- Yes
- (6) Findings were made pursuant to the provisions of CEQA
- Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.