Mitigated Negative Declaration for the Hauck Mesa Storage Reservoir Project, San Diego County Water Authority
2 Documents in Project
Summary
SCH Number
2015111037
Lead Agency
San Diego County Water Authority
Document Title
Mitigated Negative Declaration for the Hauck Mesa Storage Reservoir Project, San Diego County Water Authority
Document Type
NOD - Notice of Determination
Received
Posted
2/4/2016
Document Description
The San Diego County Water Authority proposes to demolish the existing 40-foot diameter, 70 foot tall VCMWD water tank and construct and operate a new Flow Regulatory Storage (FRS) reservoir and associated control facility. The new FRS reservoir would be approximately 80 ft in diameter; approximately 55 ft in height above ground surface, and have a volume of 1.1 million gallons, and would connect to the Valley Center Pipeline. The project is proposed to provide surge protection along with service reliability and efficiency in the Valley Center area against outage events that could impede daily operation of the Valley Center Pump Station.
Contact Information
Name
Mark V. Egio
Agency Name
San Diego County Water Authority
Contact Types
Lead/Public Agency
Phone
Location
Coordinates
Counties
San Diego
Cross Streets
West Lilac and Lavendar Point Lane
Zip
92026
Total Acres
0.44
Parcel #
129-200-0900
Airports
Blackinton Airstrip (private)
Waterways
Keys Canyon Creek
Township
10S
Range
2W
Section
29
Base
Pala
Other Location Info
Valley Center
Notice of Determination
Approving Agency
San Diego County Water Authority
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.