Geneseo Road Bridge at Huerhuero Creek Project

2 Documents in Project

Summary

SCH Number
2015111022
Lead Agency
San Luis Obispo County
Document Title
Geneseo Road Bridge at Huerhuero Creek Project
Document Type
NOD - Notice of Determination
Received
Posted
1/26/2016
Present Land Use
Agriculture, Residential Rural
Document Description
The San Luis Obispo County Department of Public Works proposes to replace the existing low water crossing on Geneseo Rd at Huerhuero Creek with a new 200 ft long bridge. The new bridge will consist of a multi-span reinforces concrete slab with a clear deck width of 32 ft to accommodate four-ft shoulders and 12-ft lanes. The project will result in the disturbance of approximately 3.3 acres. Geneseo Rd will be closed to through traffic during construction. Staging will occur within the road right-of-way. The project is being advanced under the Federal Highway Bridge Program which provides for replacement of low water crossings.

Contact Information

Name
Eric Wier
Agency Name
San Luis Obispo County
Contact Types
Lead/Public Agency

Location

Cities
Paso Robles
Counties
San Luis Obispo
Cross Streets
Geneseo Rd., Creston Rd.
Zip
93446
Total Acres
3.3
Schools
Paso Robles Joint Unified School District
Waterways
Huerhuero Creek
Township
27S
Range
13E
Section
15
Base
Mt.Diabl

Notice of Determination

Approving Agency
San Luis Obispo County
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print