Removal Action Workplan for Parcel 1, Former Nabisco Facility

Summary

SCH Number
2015109003
Lead Agency
City of Buena Park
Document Title
Removal Action Workplan for Parcel 1, Former Nabisco Facility
Document Type
NOD - Notice of Determination
Received
Posted
10/13/2015
Document Description
Approval of a Removal Action Workplan (RAW) by the DTSC that would authorize activities related to the mitigation of soil vapors composed of various volatile organic compounds; and total petroleum hydrocarbons and polycyclic aromatic hydrocarbons located within the stockpile of crushed concrete and asphalt. Activities to be conducted pursuant to the approved RAW include: - on site relocation and burial of stockpiles of crushed concrete and asphalt throughout the residential parcel within 5-10 ft below the ground surface, above the historic high ground water level; - placement of at least 5 ft of clean soil material above the buried material; - installation of soil vapor barriers with passive venting beneath all of the residential structures, to prevent migration of soil vapor gases; - excavation and disposal of impacted soil, if found during grading activities; - recording a land use covenant ensuring that vapor barriers are operated and maintained and that future uses of the property are consistent with the operation and maintenance of the vapor barriers; and - recording a land use covenant ensuring that the clean soil cover is operated and maintained and that future uses of the property are consistent with the operation and maintenance of the clean soil cover.

Contact Information

Name
Anantaramam Peddada
Agency Name
Department of Toxic Substances Control
Contact Types
Lead/Public Agency

Location

Counties
Orange

Notice of Determination

Approving Agency
DTSC
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes