CAAQ 11.87 Embankment/Foundation Grouting and Linear Repair
Summary
SCH Number
2015108282
Public Agency
California Department of Water Resources
(DWR)
Document Title
CAAQ 11.87 Embankment/Foundation Grouting and Linear Repair
Document Type
NOE - Notice of Exemption
Received
Posted
10/20/2015
Document Description
The repair site is approx. 400 feet long, with each panel measuring roughly 12.5 feet by 12.5 feet. The contractor will drill through the aqueduct secondary access road and embankment to a depth of approx. 30 feet. Grout will be pumped into the bottom of the drilled hole with the objective of filling voids in the embankment or foundation. Minor repairs to the concrete panels will be done by divers who will apply epoxy to small cracks. Larger cracks will be repaired by divers who will drill holes into and through the concrete lining near and around the damaged area. Grout will then be injected into the drilled holes, filling any voids behind the lining. After the voids are filled, the drill holes will be sealed with epoxy.
Contact Information
Name
Jerry Snow
Agency Name
California Department of Water Resources
Contact Types
Lead/Public Agency
Phone
Location
Cities
Byron
Counties
Contra Costa
Notice of Exemption
Exempt Status
Categorical Exemption
Type, Section or Code
S:15301, Class 1
Reasons for Exemption
Existing Facilities.
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.