Curtis Creek Water Supply Project

Summary

SCH Number
2015108143
Public Agency
Curtis Creek School District
Document Title
Curtis Creek Water Supply Project
Document Type
NOE - Notice of Exemption
Received
Posted
10/8/2015
Document Description
The project is a feasibility study for the proposed construction project that aims to solve domestic and irrigation water shortages at Curtis Creek Elementary School. The proposed project includes consolidatin with Tuolumne Utilities District to improve the water system, in compliance with the Safe Drinking Water Act. The planning project will consist of ground-breaking activity along Stand Road, in the form of boring samples that will assist in the design of the proposed water line along the road.

Contact Information

Name
Kevin Shinn
Agency Name
Curtis Creek School District
Contact Types
Lead/Public Agency

Location

Cities
Sonora
Counties
Tuolumne

Notice of Exemption

Exempt Status
Categorical Exemption
Type, Section or Code
15306, Class 6
Reasons for Exemption
This is a planning/feasibility study that will require boring samples to assist with the proposed project.

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print