DC Fast Charging on I-5 and 99 Corridors

Summary

SCH Number
2015108101
Lead Agency
Energy Commission (California Energy Commission)
Document Title
DC Fast Charging on I-5 and 99 Corridors
Document Type
NOE - Notice of Exemption
Received
Posted
10/6/2015

Document Description
This Agreement is to install DC Fast Chargers for plug-in electric vehicles (PEVs) at 10 locations along the I-5 and Highway 99 corridors throughout California. DC Fast Chargers allow PEV drivers to charge their vehicles significantly faster thus allowing PEV drivers travel farther through the State.

Contact Information
Sam Lerman
California Energy Commission
1516 Ninth Street, MS-27
Sacramento, CA 95814

Phone : (916) 654-4649

Location

Cities
Fresno Merced Stockton
Counties
Fresno Merced San Joaquin

Notice of Exemption

Exempt Status
Categorical Exemption
Type, Section or Code
15301, 3, 4 - Class 1, 3, & 4
Reasons for Exemption
All power will be provided from the existing electrical panel and the work includes installations of conduit, wiring, electrical connections and mounting equipment. Minor trenching may be required to bring power from local sources to proposed charging stations.

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print