Long Ravine Pipeline Replacement Project

3 Documents in Project

Summary

SCH Number
2015102089
Lead Agency
Placer County Water Agency
Document Title
Long Ravine Pipeline Replacement Project
Document Type
NOD - Notice of Determination
Received

Document Description
Placer County Water Agency (PCWA) is proposing to construct the Long Ravine Pipeline Replacement Project. The purpose of the proposed project is to increase the operational efficiency and reduce the maintenance challenges associated with the Long Ravine Pipeline. The pipeline was installed in the early 1900s and because of the pipeline's age and condition, and the undesirable operating characteristics of the pipeline, it has been determined it needs to be replaced. The proposed project involve installing a new 30-inch, 4,900 ft. long conveyance pipeline. In addition to installing the new pipeline, the project includes replacing the existing intake structure on the Boardman Canal, construction of a new flow control facility, installation of a new 24-inch pipeline between the new flow control facility and Colfax Header Box, improvements to the Boardman Canal spillway, construction of two new access roads, and demolition activities.

Contact Information
Ken Powers
Placer County Water Agency
PO Box 6570
Auburn, CA 95604

530-823-4886

Location

Cities
Colfax
Counties
Placer
Cross Streets
Norton Grade Road and Rollins Lake Road
State Highways
I-80
Railways
UPRR
Airports
No
Schools
Colfax ES
Waterways
No

Notice of Determination

Approving Agency
PLacer County Water Agency
Approving Agency Role
Lead Agency
Approved On
Final EIR Available Location
144 Ferguson Road, Auburn, CA 95603

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A Statement of Overriding Considerations was adopted for this project
No
(5) Findings were made pursuant to the provisions of CEQA
No
Download CSV New Search