Tallac Creek Sewer Pipeline Long-Term Protection Project (Streambed Alteration Agreement EPIMS Notification No. ELD-29253-R2)

6 Documents in Project

Summary

SCH Number
2015102079
Lead Agency
Regional Water Quality Control Board, Region 6 (Lahontan)
Document Title
Tallac Creek Sewer Pipeline Long-Term Protection Project (Streambed Alteration Agreement EPIMS Notification No. ELD-29253-R2)
Document Type
NOD - Notice of Determination
Received
Posted
8/31/2022
Document Description
To permanently protect an exposed sewer pipeline crossing in Tallac Creek, the Permittee is proposing to construct a rock grade control structure in Tallac Creek. The rock grade control structure is designed to be compatible with phased actions of the Taylor and Tallac Restoration Project, which is being led by the US Forest Service, Lake Tahoe Basin Management Unit. The proposed project utilizes a rock-lined chute design and biotechnical bank stabilization treatments including revegetation with willow cuttings. The project will result in 329 cubic yards of fill associated with the rock grade control structure.

Contact Information

Name
Patrick Moeszinger
Agency Name
Department of Fish and Wildlife
Job Title
Senior Environmental Scientist, Specialist
Contact Types
Responsible Agency

Location

Counties
El Dorado
Regions
Northern California
Waterways
Tallac Creek

Notice of Determination

Approving Agency
Department of Fish and Wildlife
Approving Agency Role
Responsible Agency
Approved On
County Clerk
El Dorado
Final Environmental Document Available at
The mitigated negative declaration prepared for the project is available to the general public at the office location listed above for the Lead Agency. CDFW’s record of execution of the above Lake and Streambed Alteration Agreement as Responsible Agency is available at CDFW’s regional office.

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
No
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Attachments

Notice of Determination

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print