Western Pacific Interceptor Canal Culvert Replacement Project (Streambed Alteration Agreement No. 1600-2018-0310-R2)
4 Documents in Project
Download CSV
New Search
Print
Summary
- SCH Number
- 2015102075
- Lead Agency
- Central Valley Flood Protection Board
- Document Title
- Western Pacific Interceptor Canal Culvert Replacement Project (Streambed Alteration Agreement No. 1600-2018-0310-R2)
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 2/25/2019
- Present Land Use
- Exclusive Agriculture
- Document Description
- The project is limited to the removal and replacement of a failed drainage culvert on the eastern embankment of the WPIC. The culvert has a corroded inlet that has collapsed, sinkhole existing in the embankment near the damaged culvert, and the culvert is not conveying water adequately. Approx. 60 linear feet of 23-inch diameter corrugated metal pipe will be removed and replaced with approx. 60 feet of 24-inch diameter reinforced concrete pipe (RCP). An existing landside inlet structure will be removed and a landside inlet structure with a trash rack will be installed. *SEE NOD FOR FULL DETAILS
- Contact Information
-
Amy Kennedy
CDFW
Lead/Public Agency
1701 Nimbus Road, Suite A
Rancho Cordova, CA 95670
Phone : (916) 358-2842
Location
- Coordinates
- 39.027863°'"N 121.541055°'"W
- Counties
- Yolo
- Cross Streets
- Plumas Arboga Road and CA-70
- Zip
- 95961
- Total Acres
- .75
- Parcel #
- 014-400-014-000
- State Highways
- CA-70, 65
- Railways
- UPRR
- Schools
- Rio Del Oro ES
- Waterways
- Feather River
- Township
- 14N
- Range
- 4E
- Section
- 28
- Other Location Info
- Plumas Lake
Notice of Determination
- Approving Agency
- CDFW
- Approving Agency Role
- Responsible Agency
- Approved On
- Final Environmental Document Available at
- 1701 Nimbus Road, Rancho Cordova, CA 95670
Determinations
- (1) The project will have a significant impact on the environment
- No
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- No
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- Yes
- (4) A mitigation reporting or monitoring plan was adopted for this project
- N/A
- (5) A Statement of Overriding Considerations was adopted for this project
- No
- (6) Findings were made pursuant to the provisions of CEQA
- No
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.