State Route 88 Pine Grove Corridor Improvement Project

3 Documents in Project

Summary

SCH Number
2015102066
Lead Agency
Caltrans 6 (Fresno) (California Department of Transportation, District 6)
Document Title
State Route 88 Pine Grove Corridor Improvement Project
Document Type
NOD - Notice of Determination
Received
Posted
2/25/2016
Present Land Use
State Route

Document Description
The project proposes to make improvements to the segment of SR 88 from post mile 21.6 near Climax Rd to PM 24.6. near Tabeaud Rd. The project proposes to add 8-ft shoulders including a Class III bikeway along SR 88 through the Town. Sidewalks will also be added on both the north and south sides from Irish Town Rd to the driveway entrance to Pine Grove Elementary School. Existing roads will be realigned and signalized to improve safety through the corridor. Additionally, Utility poles will be relocated and some trees removed due to the proposed improvements and to provide the proper clear recovery zone.

Contact Information
John Gedney
ACTC
117 Valley View Way
Sutter Creek, CA 95685

Phone : (209) 267-2282
rliptak@dokkenengineering.com

Location

Coordinates
38°24'49.41"N 120°39'43.03"W
Counties
Amador
Cross Streets
Climax Road to Tabeaud Road
Total Acres
86
State Highways
Hwy 88
Schools
Pine Grove ES
Waterways
Jackson Creek and Grass Valley Creek
Township
7N
Range
12E
Section
33
Base
MDB&M
Other Location Info
Pine Grove

Notice of Determination

Approving Agency
Caltrans
Approving Agency Role
Lead Agency
Approved On
Final Environmental Document Available at
117 Valley View Way, Sutter Creek, CA 95685

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes