Soquel Forest Fire Station Replacement
2 Documents in Project
Download CSV
New Search
Print
Summary
- SCH Number
- 2015102046
- Lead Agency
- California Department of Forestry and Fire Protection (CAL FIRE)
- Document Title
- Soquel Forest Fire Station Replacement
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 12/1/2015
- Present Land Use
- Forest Fire Station, Soquel Demonstration State Forest Office and accessory structures/Rural Agricultural/Public Facility
- Document Description
- The project includes the demolition of all existing buildings and appurtenances onsite and construction of a new facility consisting of a one-engine, four-bedroom fire station combined with a mess hall and apparatus building (6,184 sf). Additional project components include a new office-education center for the Soquel Demonstration State Forest (3,000 sf), a generator pump storage building (648 sf), masonry trash enclosure (+/-150 sf), fuel vaults and tanks, hose wash rack (52 ft by 5 ft), flag pole, radio tower (35 ft) and two above ground storage tanks (eight feet high with approximate diameters of 26 ft and 15 ft). In addition to the improvements described above, the project would include additional components consisting of site grading, paving for road and parking areas, installation of retaining walls, curbs, gutters and sidewalks, storage and distribution systems, wastewater disposal systems, drainage systems and erosion control measures.
- Contact Information
-
Christina Snow
Cal Fire
Lead/Public Agency
P.O. Box 944246
Sacramento, CA 94244-2460
Phone : (916) 324-1639
Location
- Coordinates
- 37°2'48.26"N 121°56'13.94"W
- Counties
- Santa Cruz
- Cross Streets
- Olive Springs Road
- Zip
- 95073
- Total Acres
- 2.6
- Parcel #
- 103-21-116
- Schools
- Mountain ES
- Waterways
- Soquel Creek
- Township
- 10S
- Range
- 1W
- Section
- 23
- Base
- MDB&M
- Other Location Info
- Soquel
Notice of Determination
- Approving Agency
- CalFire
- Approving Agency Role
- Lead Agency
- Approved On
- Final Environmental Document Available at
- PO Box 944246, Sacramento, CA 944246-2460
Determinations
- (1) The project will have a significant impact on the environment
- No
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- No
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- Yes
- (4) A mitigation reporting or monitoring plan was adopted for this project
- N/A
- (5) A Statement of Overriding Considerations was adopted for this project
- N/A
- (6) Findings were made pursuant to the provisions of CEQA
- N/A
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.