Station A Substation Rebuild and Relocation Project

4 Documents in Project

Summary

SCH Number
2015102008
Lead Agency
Sacramento Municipal Utility District
Document Title
Station A Substation Rebuild and Relocation Project
Document Type
NOD - Notice of Determination
Received
Posted
8/15/2024
Document Description
SMUD is proposing to modify the Station G Substation design and add a 40 megavolt-ampere (MVA) 115-kV/21-kV transformer within the northwestern corner of the Station G Substation area (Station G is the substation that was built pursuant to the Station A Substation Rebuild and Relocation Project) and an offsite underground 21-kV tie-in and 115-kV tie-in. The adopted ISMND evaluated the installation of three 115-kV underground transmission lines, twelve 12-kV underground lines, four 115-kV/12-kV transformers, two 12-kV switchgears (all transitioned from the former Station A Substation) and two interconnection lines between the former Station A Substation and the new Station G Substation.

Contact Information

Name
Ammon Rice
Agency Name
Sacramento Municipal Utility District (SMUD)
Job Title
Environmental Services, Supervisor
Contact Types
Lead/Public Agency

Location

Cities
Sacramento
Counties
Sacramento
Regions
Citywide
Cross Streets
6th Street and G Street
Zip
95814
Total Acres
0.16
Parcel #
00200100620000
State Highways
I-5, HWY 80, HWY 99
Railways
UPRR
Schools
Elkhorn Village Elementary, William Land Elementary
Waterways
Sacramento River and American River
Township
09N
Range
04E

Notice of Determination

Approving Agency
Sacramento Municipal Utility District
Approving Agency Role
Lead Agency
Approved On
County Clerk
Sacramento
Final Environmental Document Available at
6201 S Street, Sacramento, CA 95817

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print