City of Fresno Priority 2 Regional Transmission Mains Supplemental MND Addendum

6 Documents in Project

Summary

SCH Number
2015101105
Lead Agency
Fresno, City of (City of Fresno)
Document Title
City of Fresno Priority 2 Regional Transmission Mains Supplemental MND Addendum
Document Type
NOD - Notice of Determination
Received

Document Description
The City is proposing to refine the segment of the pipeline alignment going through the unpaved right-of-way on the Leaky Acres site as previously analyzed in the certified Supplemental MND (SCH#2015101105). Instead, the alignment would follow north along North Chestnut Diagonal from the intersection of East Dakota Avenue and North Chestnut Ave. for approx. 1,500 feet before terminating ont he City owned parcel at the corner of North Chestnut Diagonal and North Winery Ave. The revised pipeline length would be approx. 900 feet shorter than that analyzed in the SMND. In addition, the hours of construction activities for the proposed Project are limited by the Mitigation Measure stipulated in the SMND, pursuant to the Metro Plan Update EIR. Specifically, Metro Plan Update EIR Mitigation Measure 4.8.1 limits the hours of construction within the City of Fresno to between 7:00 am and 6:00 pm Monday through Saturday, and construction activities shall be prohibited on Sundays and holidays. The City proposes to change Metro Plan Update EIR Mitigation Measure 4.8.1, as stipulated in the Supplemental MND, to conform with Article 1 - Noise regulations, Section 10-110 of the City municipal code, which allows for a permit to be issued authorizing noises prohibited by Article 1. Installation of the pipeline along the refined alignment would be otherwise consistent with the construction considerations described in the SMND, except that construction of the refined alignment would occur in a different location in comparison to that specified in the SMND.

Contact Information
Michael Carbajal
City of Fresno
2101 G Street, Building A
Fresno, CA 93706

559-621-1622

Location

Cities
Fresno
Counties
Fresno
Cross Streets
Southeast to Southwest Fresno
Zip
Varies
State Highways
Hwy 180, 168, 99, 41
Railways
Various
Airports
Fresno Yosemite Int'l
Schools
Various
Waterways
Dry Creek, Fancher Creek

Notice of Determination

Approving Agency
City of Fresno
Approving Agency Role
Lead Agency
Approved On
Final EIR Available Location
2221 Kern St., Fresno, CA 93721

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A Statement of Overriding Considerations was adopted for this project
No
(5) Findings were made pursuant to the provisions of CEQA