Fresno Priority 2 Regional Transmission Mains: Supplemental Mitigated Negative Declaration

6 Documents in Project

Summary

SCH Number
2015101105
Lead Agency
Fresno, City of (City of Fresno)
Document Title
Fresno Priority 2 Regional Transmission Mains: Supplemental Mitigated Negative Declaration
Document Type
NOD - Notice of Determination
Received
Posted
11/18/2016
Present Land Use
Varies

Document Description
SWRCB is a responsible agency for this project. The SWRCB's Safe Drinking Water State Revolving Fund Program is providing funds for the project. The City of Fresno proposes to install approx. 13.1 miles of 20 to 66 inch diameter transmission pipeline to distribute the treated water. The Regional Transmission Main's first identified in the Metropolitan Water Resources Management Plan EIR will convey water throughout the city and deliver water to the consumer. Water feeding these lines will be predominately from the new Southeast Surface Water Treatment Facility; however, the lines will also be tied to major lines fed by the existing Northeast Surface Water Treatment. All pipelines would be constructed within existing right-of-way of or within a 40-foot easement.

Contact Information
Douglas Hahn
City of Fresno
2101 G Street, Building A
Fresno, CA 93706

Phone : (559) 621-1622

Location

Cities
Fresno
Counties
Fresno
Cross Streets
Southeast to Southwest Fresno
Zip
Varies
State Highways
Hwy 180, 168, 99, 41
Railways
Various
Airports
Fresno Yosemite Int'l
Schools
Various
Waterways
Dry Creek, Fancher Creek

Notice of Determination

Approving Agency
SWRCB
Approving Agency Role
Responsible Agency
Approved On
Final EIR Available Location
1001 I Street, 17th Floor, Sacramento, CA 95814

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A Statement of Overriding Considerations was adopted for this project
No
(5) Findings were made pursuant to the provisions of CEQA
Yes
Download CSV New Search