Admiralty Drive Bridge Preventative Maintenance Project
2 Documents in Project
Summary
SCH Number
2015101103
Lead Agency
City of Huntington Beach
Document Title
Admiralty Drive Bridge Preventative Maintenance Project
Document Type
NOD - Notice of Determination
Received
Posted
12/22/2015
Present Land Use
Various
Document Description
To analyze the potential environmental impacts associated with maintenance activities on the existing Humboldt Drive Bridge to restore the integrity of its original design. Parts of the bridge have deteriorated due to normal wear from vehicular traffic and from tidal flux of the marine ecosystem setting during the last five decades, and the bridge has been deemed structurally deficient. Repair/rehabilitation would require the following maintenance measures; remove and replace the concrete barriers, sidewalks, and bridge deck; clean and paint I-girders and other steel members; remove unsound concrete and patch concrete at the bridge columns, requiring working platforms with fully enclosed protective covers. One column will be surrounded by a cofferdam to facilitate temporary de-watering and repair work. All existing utilities would be temporarily relocated and/or supported during construction, and replaced upon completion of the project.
Contact Information
Name
Hayden Beckman
Agency Name
City of Huntington Beach
Contact Types
Lead/Public Agency
Phone
Location
Coordinates
Cities
Huntington Beach
Counties
Orange
Cross Streets
PCH at Brookhurst Street
Zip
92649
Total Acres
.47
Parcel #
ROW
State Highways
Hwy 39, 1
Railways
No
Airports
No
Schools
Various
Waterways
Various
Notice of Determination
Approving Agency
City of Huntington Beach
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes