Air Park Drive Bridge Replacement (300430)
4 Documents in Project
Summary
SCH Number
2015101090
Lead Agency
San Luis Obispo County
Document Title
Air Park Drive Bridge Replacement (300430)
Document Type
NOD - Notice of Determination
Received
Posted
2/3/2016
Present Land Use
Recreation, Public Facilities, Commercial, Retail
Document Description
San Luis Obispo Co. Public Works Dept is proposing to replace the existing bridge on Air Park Dr over Meadow Creek Lagoon to improve public safety by replacing the structurally and geometrically deficient bridge. The project would replace the bridge on the existing alignment. The project is receiving funding from the Federal Highway Administration and assistance from Caltrans. Project activities would involve the diversion and dewatering of the project area within Meadow Creek Lagoon. The project will result in approximately 1.08 acres of temporary impacts and 0.5 acre of permanent impacts.
Contact Information
Name
Katie Drexhage
Agency Name
San Luis Obispo County
Contact Types
Lead/Public Agency
Phone
Location
Coordinates
Counties
San Luis Obispo
Cross Streets
Air Park Drive, Pier Avenue, Norswing Drive
Zip
93445
Total Acres
1.58
Parcel #
061-093-035, -040, -048, -050
State Highways
State Highway 1
Railways
UPRR
Airports
Oceano County
Waterways
Meadow Creek Lagoon
Other Location Info
Oceano
Notice of Determination
Approving Agency
San Luis Obispo County
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.