Winchester Pond Site Recovery Wells Phase 1

3 Documents in Project

Summary

SCH Number
2015101034
Lead Agency
Eastern Municipal Water District (EMWD)
Document Title
Winchester Pond Site Recovery Wells Phase 1
Document Type
NOD - Notice of Determination
Received
Posted
12/23/2015
Present Land Use
Public Facilities / A-1-10, RR, SP Zone/L-1, MDR, PF
Document Description
Eastern Municipal Water District proposes to construct and operate three new recovery wells at the existing Winchester Recycled Water Ponds. It is estimated that approximately 500 acres ft of recycled water from the Winchester Ponds have percolated into shallow aquifers. After conducting a feasibility study it was determined that a well recovery system was a cost effective alternative for recovering this water. The Winchester Pond site Recovery Wells Phase Project would install three new recovery wells at approximate locations RW1, RW2, and RW3. These locations were chosen as it is believed that these three wells would likely recover large amounts of recycled water. Additionally, the project would install a new 24 in connection between the 24 in and 48 in lines at Simpson Rd; and install a new 36-in line connection between the 24-in discharge and 48-in mainline, north of the existing 48-in valve located near the northwest corner of pond B.

Contact Information

Name
Helen Stratton
Agency Name
Eastern Municipal Water District
Contact Types
Lead/Public Agency

Location

Counties
Riverside
Cross Streets
Simpson and Leon Roads
Zip
92585
State Highways
Hwy 79
Railways
BNSF
Schools
Winchester ES
Waterways
Salt Creek
Township
5S
Range
3W
Section
30
Base
SBB&M
Other Location Info
Winchester

Notice of Determination

Approving Agency
Eastern Municipal Water District
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.