Lake or Streambed Alteration Agreement No. 1600-2015-0369-R1 Cold Springs Emergency Timber Operations 2-15EM-100TRI

Summary

SCH Number
2015099010
Lead Agency
California Department of Forestry and Fire Protection (CAL FIRE)
Document Title
Lake or Streambed Alteration Agreement No. 1600-2015-0369-R1 Cold Springs Emergency Timber Operations 2-15EM-100TRI
Document Type
NOD - Notice of Determination
Received
Posted
9/21/2015
Document Description
The project is limited to 9 existing crossings (3, 8, 9, 13, 14, 15, 16, 17, and 18) and 8 existing water drafting sites on unnamed Class II, III, and IV watercourses. Existing rocked fords will be used at watercourse crossings 3, 8, 9 and 13. Sites 14, 15, 16, 17 and 18 will be permanent culverted crossings sized to accommodate the 100 year flood flows. Rock will be placed over the crossing and critical dip installed to prevent stream diversions in the event of culvert plugging. All drafting locations already exist and were historically used by other timber owners. Only site 3.1 requires modification. Site 3.1 will have a temporary sand bag dam installed above the existing pond with a 6 in pipe installed in order to convey flow back to the stream below the dam. Small amounts of spill from the temporary dam will be used to fill the pond while maintaining flow in the stream. The temporary dam will be removed following completion of operations.

Contact Information

Name
T.O. Smith
Agency Name
CDFW Northern Region
Contact Types
Lead/Public Agency

Location

Counties
Trinity

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print