Huntington STate Beach - Multi-Use Trail Replacement Project

Summary

SCH Number
2015098477
Public Agency
California Department of Parks and Recreation
Document Title
Huntington STate Beach - Multi-Use Trail Replacement Project
Document Type
NOE - Notice of Exemption
Received
Posted
9/30/2015

Document Description
This project involves removing and replacing the surface along the entire length of the Multi--use trail (22' wide x 11,820' long) and its 6 paved spur trails (12' wide x 3,340' long) totaling approximately 300,000 square feet of asphalt. Depth of excavation would not exceed 6-8 inches maximum.

Contact Information
Julit Tobin
California Department of Parks and Recreation
Lead/Public Agency
1416 Ninth Street P.O. Box 942896
Sacramento, CA 94296-0001

Phone : (949) 607-9510

Location

Cities
Huntington Beach
Counties
Orange

Notice of Exemption

Exempt Status
Categorical Exemption
Type, Section or Code
15301. 3 & 4 - Class 1, 3 & 4
Reasons for Exemption
Trail and road repairs, construction or installation of park facilities such as...restrooms and grading on land with a slope of less than 10%. The project does not involve removal of healthy, mature, scenic trees.

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print