Pinole Verizon Wireless Facility Project

3 Documents in Project

Summary

SCH Number
2015092078
Lead Agency
Pinole, City of (City of Pinole)
Document Title
Pinole Verizon Wireless Facility Project
Document Type
NOD - Notice of Determination
Received
Posted
2/12/2016
Present Land Use
Various

Document Description
The project is a wireless telecommunications facility and consists of the installation of six panel antennas mounted within a new faux chimney/cupola affixed to the existing rooftop of the detached garage associated with the existing residence. A 252-sf equipment/lease area would be constructed adjacent to the faux chimney/cupola and would include an eight-hour battery pack for emergency purposes. The equipment area would be enclosed with a solid 6-ft redwood fence with a two-ft lattice cap. Landscaping would be included on two sides of the redwood fence area for partial screening purposes.

Contact Information
Winston Rhodes
City of Pinole
2131 Pear Street
Pinole, CA 94564

Phone : (510) 724-9017

Location

Coordinates
37°58'46.63"N 122°15'25.70"W
Cities
Pinole
Counties
Contra Costa
Cross Streets
Pfeiffer Way and Pfeiffer Lane
Zip
94564
Total Acres
.103
Parcel #
360-131-036
State Highways
I-80
Schools
Various
Waterways
Pinole Creek Sobrante and Mendocino Reservoirs
Township
2N
Range
4W
Section
36
Base
MDB&M

Notice of Determination

Approving Agency
City of Pinole
Approving Agency Role
Lead Agency
Approved On
Final Environmental Document Available at
2131 Pear St, Pinole, CA 94564

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No
Download CSV New Search