Niles Canyon Safety Improvements Project (EA 2A332)

8 Documents in Project

Summary

SCH Number
2015092075
Lead Agency
California Department of Transportation, District 4
Document Title
Niles Canyon Safety Improvements Project (EA 2A332)
Document Type
NOD - Notice of Determination
Received
Posted
1/26/2018
Present Land Use
Rural/open space/watershed land
Document Description
Caltrans proposes to construct multiple safety improvements at specific site locations along the SR 84 corridor between SR 238 (Mission Blvd) and the SR 84/I-680 Separation. The project alternative developed to meet the purpose and need of the project is the Build Alternative. Improvements of the Build Alternative include fixed object removal and relocation, the installation of rock drapery systems, limited shoulder widening, widening and barrier replacement on Alameda Creek Bridge and Overhead (bridge 33-0039), and the signalization of the Pleasanton-Sunol Road / SR 84 intersection.

Contact Information

Name
Brian Gassner
Agency Name
California Department of Transportation, District 4
Contact Types
Lead/Public Agency

Location

Cities
Fremont
Counties
Alameda
Cross Streets
Mission Boulevard (SR 238) and I-680
Zip
94536
State Highways
SR 84 and I-680
Railways
Niles Canyon Railway
Schools
Sunol Glen ES
Waterways
Alameda Creek
Other Location Info
Niles and Sunol

Notice of Determination

Approving Agency
Caltrans
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes