Miller Avenue Tide Gate Replacement (Lake or Streambed Alteration Agreement No. 1600-2015-0387-R3)

2 Documents in Project

Summary

SCH Number
2015092050
Lead Agency
City of Mill Valley
Document Title
Miller Avenue Tide Gate Replacement (Lake or Streambed Alteration Agreement No. 1600-2015-0387-R3)
Document Type
NOD - Notice of Determination
Received
Posted
1/13/2017
Present Land Use
None - Public Roadway
Document Description
CDFW has executed Lake and Streambed Alteration Agreement No. 1600-2015-0387-R3, pursuant to section 1602 of the Fish and Game Code to the project Applicant, Andrew Poster representing City of Mill Valley Department of Public Works. Project is limited to a permanent tide gate replacement within a Class I tidal channel tributary to Bothin Marsh a tributary to Arroyo del Corte Madera de Presidio. This feature will be constructed as part of the Miller Avenue Improvement Project. The existing 30-inch culvert passes beneath a sidewalk on the north side of Miller Avenue. The culvert is fitted with a tide gate that is failing due to the gate not closing and instead allowing tidal water to flow pass freely upstream. Upstream of the culvert is a 3-foot wide deep channel with steep banks dominated by ruderal and brackish vegetation. Downstream of the culvert is mud-bottom tidal channel that flows east to Bothin Marsh. Permittee will replace an existing 30-inch diameter, 10-foot long culvert and malfunctioning flap gate with two 48-inch diameter RCP culverts and a new floating flap gate that will prevent tidal intrusion into the drainage channel while allowing stormwater to escape.

Contact Information

Name
Julie Coombes
Agency Name
CDFW
Contact Types
Lead/Public Agency

Location

Cities
Mill Valley
Counties
Marin
Cross Streets
Miller Avenue from Almonte Boulevard to Sunnyside Avenue
Zip
94941
Total Acres
30
Parcel #
030-390-34, 030-101-37, 052-350-28
State Highways
Hwy 101
Schools
Tamalpais HS
Waterways
Arroyo del Corte Madera de Presidio, Richardson Bay
Township
1N
Range
6W

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
N/A
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
N/A
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print