Test Well Drilling Project

3 Documents in Project

Summary

SCH Number
2015091064
Lead Agency
Allensworth Community Services District
Document Title
Test Well Drilling Project
Document Type
NOD - Notice of Determination
Received
Posted
11/9/2017
Document Description
The test well project will involve the drilling of a hole to a depth of approximately 500-ft using a single drill rig with attached casing hammer and necessary tooling. The approximate footprint of this equipment is 30-ft by 50-fy. The test will advance an 8-5/8" diameter steel casing as it drills and will collect water quality samples at each water bearing formation encountered as the drilling progresses. Approximately 8 cy of earth material or drill cuttings will be removed during the test well project and this material will be discharged to above ground tanks that can be removed and disposed of at the completion of the project. As water bearing formations are encountered and water quality samples collected, the pumped water will be discharged to above ground tanks. It is anticipated that there would be approximately twelve water quality samples each pumped for 10 minutes at approximately 50 gpm to 80 gpm. At the completion of the test hole, it will be filled with cement from the bottom to 6-ft below ground surface and the ground surface restored to original conditions.

Contact Information

Name
Cindy Luna
Agency Name
Allensworth Community Services District
Contact Types
Lead/Public Agency

Location

Counties
Tulare
Cross Streets
Hwy 43
Zip
93219
Total Acres
.2
Parcel #
333-252-020
Township
24
Range
24
Section
13
Base
MDB&M
Other Location Info
Allensworth

Notice of Determination

Approving Agency
Allensworth Community Services District
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print