Vine 69/12 kV Substation Project

3 Documents in Project

Summary

SCH Number
2015091059
Lead Agency
California Public Utilities Commission (CPUC)
Document Title
Vine 69/12 kV Substation Project
Document Type
NOD - Notice of Determination
Received
Posted
6/1/2016
Present Land Use
Substation: Vacant; Zoning: IS-1-1 (Light Industrial); GP: Industrial Employment
Document Description
San Diego Gas and Electric proposes to construct and operate the Vine 69/12 kV Substation Project (Proposed Project). The Vine Substation Project is proposed to be located within the southwestern portion of the City of San Diego, CA near the San Diego International Airport. The proposed Project includes four major components: 1) construction of the Vine Substation, located at 3548 Kettner Blvd. at the corner of Vine St. and Kettner Blvd.; 2) relocation of several 12-kV distribution circuits within City of San Diego public streets; 3) loop-in of an existing 69-kV power line to the new substation; and 4) upgrade of an existing telecommunication system.

Contact Information

Name
Eric Chiang
Agency Name
California Public Utilities Commission
Contact Types
Lead/Public Agency

Location

Cities
San Diego
Counties
San Diego
Cross Streets
Vine Street and Kettner Boulevard (substation)
Zip
92101
Total Acres
1.28
Parcel #
451-690-1800
State Highways
Hwy 5, 8, 94, 163, 209
Railways
Amtrak/MTS
Airports
San Diego (SAN)
Schools
35
Waterways
Pacific Ocean

Notice of Determination

Approving Agency
CA Public Utilities Commission
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print