San Juan Creek Ocean Outfall Junction Structure Rehabilitation Project

3 Documents in Project

Summary

SCH Number
2015091058
Lead Agency
South Orange County Wastewater Authority
Document Title
San Juan Creek Ocean Outfall Junction Structure Rehabilitation Project
Document Type
NOD - Notice of Determination
Received
Posted
11/13/2015
Present Land Use
Recreation
Document Description
The proposed project consists of the inspection, assessment, and rehabilitation of the Junction Structure. Located at Doheny State Beach, adjacent to San Juan Creek and approximately 200 feet from the Doheny State Beach Campground, the Junction Structure is a reinforced concrete structure, approximately 10 feet inside diameter by 26 feet tall. The top of the Junction Structure is 15 feet in diameter and has a top elevation of approximately 6.5 feet above MSL. The typical elevation of the beach in the vicinity of the structure is approximately 10 feet above MSL. Temporary excavation of beach sand will therefore be necessary to gain access to the structure for performance of its rehabilitation.

Contact Information

Name
Janie Chen
Agency Name
South Orange County Wastewater Authority
Contact Types
Lead/Public Agency

Location

Cities
Dana Point
Counties
Orange
Cross Streets
Pacific Coast Highway and Dana Point Harbor Drive
Zip
92629
State Highways
I-5 & SR-1
Railways
So. Cal. Regional Rail
Schools
Capistrano Unified
Waterways
San Juan Creek
Township
8S
Range
8W
Section
23
Base
SBB&M

Notice of Determination

Approving Agency
South Orange County Wastewater Authority
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.