Rockvill RV & Self Storage

3 Documents in Project

Summary

SCH Number
2015091037
Lead Agency
City of Santee
Document Title
Rockvill RV & Self Storage
Document Type
NOD - Notice of Determination
Received
Posted
1/11/2021
Present Land Use
Self Storage
Document Description
The project is a Minor Revision to a previously approved Conditional Use Permit (CUP: P2015-4), and an Addendum to a previously approved Negative Declaration. The original CUP for a mini storage facility was approved to be constructed in two phases on a 5.16-acre project site. The original CUP approved nine (9) mini storage buildings with a total of 174,465 square feet at full build-out, with the buildings ranging in height from 1- to 2-stories. Phase 1 has completed construction on three (3) of the nine (9) mini storage buildings, an interim RV carport, and an exterior parking area for 75 RV/boats. With Phase 1 construction complete, the applicant requests to reduce the total number of buildings from nine (9) to eight (8) buildings, increase the size and height of two (2) of the mini storage buildings from 2-stories to 3-stories, thereby increasing the overall building square footage from 174,675 square feet to 224,730 square feet. Phase 1 of this project has fully graded and paved the construction limits of the original project and no additional land disturbance is proposed. Case File: MR2020-1

Contact Information

Name
Kristen Mitten
Agency Name
City of Santee
Contact Types
Lead/Public Agency

Name
Agency Name
Waneta Lee, William Cameron Family Management Co.
Contact Types
Project Applicant

Location

Cities
Santee
Counties
San Diego
Cross Streets
Magnolia Ave. and Rockvill St.
Zip
92071
Total Acres
5.16
Parcel #
384-470-04
Other Location Info
10775 Rockvill St. Santee, CA 92071

Notice of Determination

Approving Agency
City of Santee
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
Yes (Addendum)
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
No
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Attachments

Notice of Determination

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.